NMG Issues Updated Feasibility Study for its Integrated Phase-2 Ore-to-Active-Anode-Material Operations: the Matawinie Mine and the Bécancour Battery Material Plant

Nouveau Monde Graphite Inc. (“NMG” or the “Company”) (NYSE: NMG, TSX: NOU) issues the results of the Updated Technical Feasibility Study Report for the Matawinie Mine and Bécancour Battery Material Plant Integrated Graphite Projects (the “Updated Feasibility Study”) carried out in accordance with the National Instrument 43-101 (“NI 43-101”). Conducted by BBA Inc. and various specialized consultants, the Updated Feasibility Study pulled from NMG’s 2022 Feasibility Study and updated key parameters in light of technological development, project optimizations, engineering advancement, and updated economic factors.

mine

NMG’s integrated production model, covering the full value chain from mining to advanced processing, is designed to cater to the North American electric vehicle (“EV”) and energy storage market with a turnkey, local source of natural graphite active anode material. NMG has signed offtake agreements with Panasonic Energy Co., Ltd. (“Panasonic Energy”), a wholly owned subsidiary of Panasonic Holdings Corporation (“Panasonic”) (TYO: 6752), and General Motors Holdings LLC, a wholly owned subsidiary of General Motors Co. (collectively, “GM”) (NYSE: GM), (together, NMG’s “Anchor Customers”) covering more than 80% of the Company’s planned Phase-2 production of active anode material.

Results of the Updated Feasibility Study indicate that NMG’s Phase 2 is technically feasible as well as economically viable. Upon a positive final investment decision (“FID”), the Matawinie Mine and Bécancour Battery Material Plant could be built and enter commercial production within less than three years. Considering that its project financing, nearly 100% of its revenue, a significant amount of its capital expenditures and interest expenses are expected to be denominated in U.S. dollars, the Company has aligned the Updated Feasibility Study financial metrics with this currency, enabling a better representation of the underlying economic realities of the cash flows associated with this integrated project and the associated capital structure.

Arne H Frandsen, Chair of NMG, said: “The underlying driver for NMG’s ore-to-battery-material business is undeniable. While inflation, geopolitics, and trade dynamics create turbulences, we are focused on delivering on our mission to responsibly produce carbon-neutral advanced graphite materials to power the energy transition. Today’s results demonstrate the attractive operation that we have engineered within a stable jurisdiction and underpinned by high ESG principles to help North American manufacturers secure and reshore their supply chain.”

Eric Desaulniers, Founder, President, and CEO of NMG, declared: “We have been hard at work over the past months to examine, challenge, and refine every component of our future operations. The input of our Anchor Customers coupled with advanced precision through engineering, equipment specifications, procurement, and construction planning have enabled us to optimize our projected Phase-2 commercial production. We are confident that our plans will deliver a performing and competitive operation, supplying highly specialized products to our Anchor Customers. I am eager to present the results to our financial partners in view of FID.”

Integrated Production, From Ore to Battery Materials

Leveraging the Matawinie Mine production as feedstock for the Bécancour Battery Material Plant, NMG has developed an integrated material flowsheet to maximize the production of high-value active anode material destined to the battery market segments. Hence, the two facilities are set to operate in tandem to maximize operational efficiencies and margins along the value chain.

Table 1: Economic Highlights of NMG’s Integrated Phase-2 Graphite Operations

ECONOMIC HIGHLIGHTS

 

Matawinie Mine

 

Bécancour Battery

Material Plant

 

INTEGRATED

NMG MODEL

 

Pre-tax NPV (8% discount rate)

 

US$402M

 

US$926M

 

US$1,328M

 

After-tax NPV (8% discount rate)

 

US$252M

 

US$801M

 

US$1,053M

 

Pre-tax IRR

 

17.7%

 

17.1%

 

17.3%

 

After-tax IRR

 

16.0%

 

18.0%

 

17.5%

 

Pre-tax payback

 

5.5 years

 

6.0 years

 

5.8 years

 

After-tax payback

 

5.2 years

 

5.0 years

 

5.0 years

 

Initial CAPEX

 

US$415M

 

US$911M

 

US$1,326M

 

Annual OPEX

 

US$44M

 

US$124M

 

US$168M

 

Costs reflect steady-state production, exclude the initial ramp-up period, and are based on normalized operations

The after-tax IRR exceeds the pre-tax IRR, driven by the favorable impact of eligible tax credits, such as the Canadian Clean Technology Manufacturing Investment Tax Credit, Zero-Emission Technology Manufacturing (ZETM) tax measures, provincial tax holidays for large investment projects and other available incentives.

Both greenfield projects, the Matawinie Mine and Bécancour Battery Material Plant were costed using test work results, Phase-1 operations, supplier quotations and consultants’ in-house databases. NMG and its consulting firms have refined design, engineering, and construction parameters to enable cost optimization. Furthermore, reserved blocks of Québec’s affordable clean hydropower underpins the Company’s operations, economics structure and carbon-neutrality commitment.

NMG’s integrated business model, with a secured feedstock, close-by operations at the western market’s doorstep and operational flexibility to adapt production based on demand, represents a stable and cost-effective structure in today’s everchanging macroeconomics.

The Company’s advanced processing capacities at the future Phase-2 Bécancour Battery Material Plant enable tailored production to unique customer specifications. The majority of the future Matawinie Mine production is set to be refined into active anode material, while a portion of jumbo and large high-purity flake graphite is set to be directed to specialty markets, with some flexibility in the allocation of volumes.

The Updated Feasibility Study incorporates NMG’s supply agreements with Panasonic Energy, GM and Traxys, as well as market studies by Benchmark Mineral Intelligence, a recognized, regulated and independent price reporting agency. NMG’s previously announced offtake agreements, which are subject to completion of conditions precedent and the project-related agreements, with its Anchor Customers provide visibility, pricing confidence, and reduced commercialization costs.

Table 2: Commercialization Plans for NMG’s Integrated Phase-2 Production

Products

Volume1

 

Average Price

 

Flake graphite

14,720 tpa

 

US$1,469/tonne

 

Active anode material

44,100 tpa

 

US$9,346/tonne (Y1 to Y7)

US$10,402/tonne (Y8 to Y25)

US$10,106/tonne (LOM average)

 

Micronized by-products

43,334 tpa

 

US$400/tonne

 
  1. Volumes reflect steady-state production, exclude the initial ramp-up period, and are based on normalized operations.

 

Matawinie Mine

The Matawinie Mine remains largely the same as reflected in NMG’s previous technical report. The Updated Feasibility Study considers revised key parameters and costs, leveraging advancement in the project since the 2022 report, namely through detailed engineering, preparatory work at the site, key contracts awarded and/or negotiated, procurement planning, construction preparation, as well as optimization of operations between the two Phase-2 facilities.

The Matawinie graphite property, in which the Company owns a 100% interest, is located approximately 120 km as the crow flies north of Montréal, Québec, Canada, in Saint-Michel-des-Saints. The Tony Claim Block, part of the property, is composed of 159 exclusive exploration rights totaling 8,266 hectares. Since the deposit discovery, a comprehensive exploration program identified crystalline flake graphite mineralization, ultimately leading to the definition of Mineral Resources and Mineral Reserves (as presented below).

The Mineral Resources for the West Zone of the mining property is based on a total of 8,274 assay intervals collected from 27,888 m of core drilling and three surface trenches providing 207 channel samples. Proper quality control measures, including the insertion of duplicate, blank, and standard samples, were used throughout the exploration programs and returned within acceptable limits.

Table 3: Current Pit-Constrained Mineral Resource Estimate for the West Zone

Mineral Resources Category1, 2

Current Resources (March 25, 2025)5, 6, 7

 

Tonnage (Mt)

 

C(g) Grade (%)3

 

Contained

Graphite (Mt)

 

Measured

28.5

 

4.28

 

1.22

 

Indicated

101.8

 

4.26

 

4.33

 

Measured + Indicated

130.3

 

4.26

 

5.55

 

Inferred4

23.0

 

4.28

 

0.98

 
  1. The Mineral Resources provided in this table were estimated by Yann Camus P.Eng., Qualified Person of SGS Geological Services, using current Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) Standards on Mineral Resources and Reserves, Definitions and Guidelines.
  2. Mineral Resources that are not Mineral Reserves have not demonstrated economic viability. Additional trenching and/or drilling will be required to convert Inferred and Indicated Mineral Resources to Measured Mineral Resources. There is no certainty that any part of a Mineral Resource will ever be converted into Reserves.
  3. All analyses used for the Resource Estimates were performed by ALS Minerals Laboratories and delivered as % C(g), internal analytical code C-IR18.
  4. Inferred Mineral Resources represent material that is considered too speculative to be included in economic evaluations. Additional trenching and/or drilling will be required to convert Inferred Mineral Resources to Indicated or Measured Mineral Resources. It cannot be assumed that all or any part of the Inferred Resources will ever be upgraded to a higher Resource category.
  5. Current Resources effective March 25, 2025.
  6. Mineral Resources are stated at a cut-off grade of 1.78% C(g).
  7. Quality control standards used for these Mineral Resources returned within acceptable limits, no significant bias was found.
 

Table 4: Matawinie Mineral Reserve Estimate for the West Zone

Category

Tonnage (Mt)

 

C(g) Grade (%)

 

Contained

Graphite (Mt)

 

Proven

17.3

 

4.16

 

0.7

 

Probable

44.3

 

4.26

 

1.9

 

Proven & Probable

61.7

 

4.23

 

2.6

 
  1. The Qualified Person for the Mineral Reserve Estimate is Jeffrey Cassoff, P.Eng., of BBA Inc.
  2. The effective date of the estimate is March 25, 2025.
  3. Mineral Reserves were estimated using a graphite concentrate selling price of US$1,334/t, and consider a 2% royalty, and selling costs of US$34.23/t. An average grade of 97% C(t) was considered for the graphite concentrate.
  4. A metallurgical recovery of 93% was used.
  5. A cut-off grade of 2.20% C(g) was used.
  6. The strip ratio for the open pit is 1.16 to 1.
  7. The Mineral Reserves are inclusive of mining dilution and ore loss.
  8. The reference point for the Mineral Reserves is the primary crusher.
  9. Totals may not add due to rounding.
 

The future Matawinie Mine site is easily accessible via the dedicated access road that NMG built to connect to the local highway and is close to key infrastructure, including paved roads and high-voltage power lines, and the regional community, which provides a pool of workers and contractors. The project is in proximity to the Montréal metropolitan area, which also has skilled labor and many key suppliers.

Since 2015, multiple metallurgical process development and optimization programs have been carried out on samples from the Matawinie graphite mineralization zones. The programs focused on the development of a flowsheet that maximizes concentrate grade and recovery, while minimizing flake degradation. NMG has been operating the Phase-1 Matawinie Demonstration Plant since 2018 to help de-risking the process and produce graphite concentrate samples for customer evaluation and processing technological development. All components incorporated in the Matawinie Mine process are mature technologies.

With a 25-year life of mine (“LOM”), the Matawinie Mine will leverage the West Zone deposit for a nominal production of 105,882 tonnes per annum (“tpa”) of graphite concentrate. The deposit will be mined using conventional open-pit mining methods consisting of drilling, blasting, loading, and hauling. To maximize the NPV, mining phases have been designed and incorporated into the mining plan to defer waste rock stripping and provide a balanced blended feed grade for the on-site concentrator over the LOM. Through crushing, milling, flotation, cleaning, and drying, the ore will be concentrated to attain 97.5% C(t).

Tailings produced at the concentrator will be segregated after the desulphurization circuit into low-sulphur content of non-acid generating (“NAG”) tailings and a sulphide concentrate of potentially‑acid generating (“PAG”) tailings. Both NAG and PAG will be filtered to reduce water content and then co-disposed with waste rock into deposition cells on a lined platform. The co‑deposition storage facility will be located at surface and as of Year 7, tailings and waste rocks will also be placed in the mined-out areas of the open pit. The deposit will be mined from south to north to ensure adequate space is available for in‑pit backfilling.

Table 5: Operational and Economic Highlights of the Matawinie Mine

Parameters

 

 

LOM

25 years

 

Nominal annual processing rate

2.56 M tonnes

 

Stripping ratio (LOM)

1.16:1

 

Average grade (LOM)

4.23% C(g)

 

Average mill recovery

93%

 

Nominal annual graphite concentrate production

105,882 tonnes

 

Finished product purity

97.5% C(t)

 

CAPEX

US$415M

 

Annual OPEX

US$44M

 

OPEX cost per tonne of graphite concentrate

US$419/tonne

 

Costs reflect steady-state production, exclude the initial ramp-up period, and are based on normalized operations.

 

ministerial decree authorizing the Matawinie Mine (Decree # 47-2021) was granted by the Québec Government and all permits and authorizations pertaining to exploration, geotechnical, hydrogeological, and early preparatory works to date have been obtained.

Early works at the Matawinie Mine have included thus far tree clearing, construction of the nearly 8-km access road, preparation of the industrial pad, and civil works for environmental infrastructure. The site is considered concrete-ready for the start of construction upon a positive FID, with a number of key contracts having been awarded, including process equipment, the dedicated powerline and the electrical substation.

Bécancour Battery Material Plant

The Phase-2 Bécancour Battery Material Plant is planned as a comprehensive advanced processing platform set to receive Matawinie graphite concentrate production for refining and commercial distribution. Plans for this facility have been substantially revised using inputs from NMG’s Phase-1 operations, technology development, and engineering.

Approximately 150 km northeast of Montréal on the Saint Lawrence River, in the heart of Québec’s “battery valley”, NMG’s Bécancour site is located adjacent to its Phase-1 purification plant, within an established industrial park. The site provides robust local infrastructure with a direct supply of chemicals from nearby producers, affordable hydroelectricity, multimodal logistics (international deep-sea port, railway, and expressway) and a regional pool of skilled workforce.

The future Bécancour Battery Material Plant will regroup shaping, purification and coating capacities to produce battery-grade active anode material.

The shaping process, essentially a mechanical transformation, reduces the flake size (micronization) and rounds graphite material (spheronization) to increase the density of the spherical graphite for battery use. At its Phase-1 facility, NMG has already assimilated and refined this process, and tested different equipment to inform the engineering of the Phase-2 plant. Shaping generates a micronized graphite by-product to be sold.

Purification removes impurities from the spheronized graphite to bring the product to ≥99.90% carbon content. Following testing at its Phase-1 Purification Plant plus third-party sites, trade-off analyses and process optimization, NMG has selected the prevalent chemical purification technology for its future Phase-2 Bécancour Battery Material Plant. Commercial operations worldwide have demonstrated the performance and efficiency of this technology in line with battery manufacturers’ requirements; thus, reducing the technological risks for the project. Continued optimization of the process to refine environmental performance, operational, and financial parameters along with sample production are being carried out at partnering facilities to support detailed engineering and commercialization efforts.

The coating aims at enhancing the electrochemical performance of active anode material in lithium-ion batteries. To establish the proper technology, precursor type and process parameters, NMG performed different studies and tests at its Phase-1 facility, in independent laboratories and at suppliers’ test facilities. Most technologies selected are being widely used in the industry, further reducing technological risks.

Table 6: Operational and Economic Highlights of the Bécancour Battery Material Plant

Parameters

 

 

Annual active anode material production

44,100 tonnes

 

Finished product purity

≥99.90% C(t)

 

CAPEX

US$911M

 

Annual OPEX

US$124M

 

OPEX cost per tonne of active anode material

US$2,810/tonne

 

Annual micronized graphite by-product production

43,334 tpa

 

Costs reflect steady-state production, exclude the initial ramp-up period, and are based on normalized operations.

 

In preparation for the launch of construction, preliminary works – tree clearing, on-site road construction, site grading – were carried out in 2024.